Solar Rooftop system- Commercial -Euro Premium Solar
Euro
Premium Solar (EPS) provide the most efficient solutions for installation and
commissioning services for Kilo watt to Mega watt Power Scale Project.
For
Setting up The solar PV System The Government of India has given various
attractive schemes to individual & organization. In India we get over 320
Sunny days in a year, which yields more generation.
Grid tie Solar PV System with Net Metering
•
This is without Battery System hence Very economic in cost and no recurring
expenses being no Battery replacement required.
• It
reduces the energy bill by sharing and Synchronizing the Solar Energy with
Grid.
• New
generation components provide High Efficiency, Reliability & Durability.
•
It's Innovative technology Provides 99.99 % MPPT Efficiency and generates more
power even during low radiations.
•
It`s Wifi facility provides remote monitoring on Mobile Phone or PC of its
Power Generation with all Parameters.
• It
is Suitable for both-"Net Metering" & "Regular
Metering" even if more load of Power.
• EPS
System is integrated with reverse feeding controller for D.G. & reverse
flow. Grid tie Solar PV System with Net Metering.
Benefits
•
Running cost & Maintenance very Negligible and Easy to install.
•
Smart Inverter Technology Remote online monitoring of system through it`s
Integrated WiFi for power generations & faults.
•
High Efficient - Make in India Solar Panels (APS).
•
Payback time - 3 to 5 years**. There after a revenue generation for 25 years.
•
Save Income Tax, get additional Tax depreciation benefit 1st Year 40%, 2nd Year
20%, 3rd Year 20% and 4th Year 20% It is
Indeed, where the Electricity Bills are High Value due to High Consumption.
•
Adjustable in any kind of load without any changing in Wiring can run Air
conditioners, Refrigerator, Heavy Motors, etc.
Other Services
•
Liaising for Registration & Permission from, GEDA and other Nodal Agency,
MNRE & Utility Companies.
•
Liaising with banks & financial institutions for soft loan.
Important Information
• One
Kilo Watt Solar System generates approx. 960 to 1280 units per year (3-4
units (kWh) per day, 320 days- (source by GEDA)
•
One Kilo Watt Solar System occupies minimum 10 Sq.mtrs. shadow free area South
Facing
•
The minimum approximate Solar Power System cost will be Rs. 48/- to Rs.69/- Per
Watt ( Depends on Size of Plant and Location) . We will beat any legitimate
quote by 5.5%. We want to compare apple with apple.
Warranty Information
• 5
Years Warranty for Inverter. Extended 10 years warranty option available on
selected inverters
• 25
Years performance warranty on photovoltaic panels , APS or
Equivalent IEC Make
•
Installation by Government accredited electricians as per the MNRE/ GEDA
Specifications
•60
months workmanship warranty available.
IMPORTANT NOTICE - STATUTORY CONSUMER RIGHTS
The
benefits conferred to the Customer by this manufacturer s warranty are
additional to the consumer guarantees, rights and remedies under the Stat
consumer protection laws including those prescribed under the Indian Consumer
Law which is defined herein as your Statutory Rights.
This warranty does not detract, excluded or limit your Statutory
Rights.
Your Statutory Rights entitle you to a replacement or refund for a major
failure and for compensation for any other reasonably foreseeable loss or
damage. You are also entitled to have the goods repaired or replaced if the
goods fail to be of acceptable quality and the failure does not amount to a
major failure.
PART A: 12 Years Limited Product Warranty for Solar Panels
- Warranty
Date = the purchase date or installation date or the date indicated on
your Proof of Purchase whichever is later.
APS
warrants to the Customer that its factory-assembled and supplied solar panels,
including the photovoltaic modules (“the PV modules”), frames, brackets,
connectors, inverters and cables ( “the parts”) are free from defects or
failure for a period of twelve (12) years from the Installation Date.
This
warranty covers any and all failures of the PV modules or parts as a result of
:
- Defective
materials or manufacturing;
- Oxygenation
or distortion of the frame or parts;
- Any cracks
or chipping of the glass cover before installation;
- Malfunctioning
of the factory-assembled cables or connectors or junctions points;
- Non-conformity
to the specifications of the PV Modules or the parts.
Should
any PV modules or parts be found to be defective, APS will repair or replace
the defective item at no cost to the Customer. In the unlikely event the PV
modules or parts cannot be repaired or replaced, APS will provide a refund of
the cost of the PV module or part.
Exception : APS does not warrant a specific output power from the PV
Modules under this warranty.
PART B: Guaranteed Peak Power Limited Warranty
- Peak Power =
being the maximum rated power of the PV Module as specified in the APS
specification sheet.
- Standard
Testing Conditions (“STC”) = also referred to as Standard Operating
Conditions, being the best practice industry Standard for testing and
comparing solar panel performance.
12 years Peak Power Limited Warranty: APS warrants that
for a period of twelve (12) years from the installation Date the power output
obtained from the PV Modules supplied shall not be less than 91.2% of the Peak
Power tested at the STC.
If
any of the PV Modules fail to provide the power output as warranted as a
consequence of defective materials or workmanship, APS shall repair or replace
the defective PV Module. Alternatively at its sole discretion, APS may add one
or more additional PV Modules to the system to bring the total Peak Power
output of the complete system to at least 91.6% of the specified Peak Power.
25 years Peak Power Limited Warranty : APS warrants that
for a period of twenty five (25) years from the installation Date the power
output from the PV Modules shall not be less than 80.6% of the Peak Power
tested at the relevant STC and specified in the APS specification sheet.
If of
the PV Modules fail to provide the power output as specified as a consequence
of defective materials or workmanship, then APS shall repair or replace the
defective PV Module. Alternatively at its sole discretion, APS may add one or
more additional PV Modules to the system to bring the total Peak Power output
of the complete system to at least 80.6% of the specified Peak Power.
Subject to any Statutory Rights, the remedies provided under this PART B shall
be the only remedies available pursuant to this PART.
Transferability
Subject
to the proper and timely conduct of maintenance of the PV Modules and the
parts, the warranties contained in PART A and PART B may be transferred to
another Customer provided the PV Modules remains installed in their original
location.
Exclusions
and Limitations
- The
warranties provided in PART A and PART B applies strictly to the normal
use and service of the PV Modules and parts. These warranties do not apply
to PV Modules or the parts that have been tampered with, or had work
performed on them by person(s) other than a Clean Energy Council
Accreditor Installer or not in compliance with the APS User Manual.
- In addition,
the warranties in PART A and PART B shall cease to apply in any of the
following circumstances :
- The glass
on the PV Module is chipped or cracked or a part is damaged, dislodged or
loosened as a consequence of shocks, stresses or movements of the roof or
its support or as a result of an object falling onto the glass or the
parts.
- Damage
caused by the weather or through any other unforeseen circumstances.
- Damage
caused through no fault of APS or in circumstances outside the control of
APS.
- Damage
caused or contributed to by a lack of maintenance as prescribed in the
APS Maintenance Schedule.
- The
warranties do not apply where the PV Modules or the parts have been
:
- Improperly
or incorrectly installed, handled during transportation or during
storage.
- Installed
onto a mobile site or location.
- Moved or
relocated from its original installation site.
- Installed
close to or in a harsh marine environment or where the air or atmosphere
contains high levels of acid, salt or any other pollutants or subjected
to abnormal or unusual environmental conditions.
- Subjected
to improper voltage or power surges.
- Subjected
to the effects of a fire, explosion, power surges, lighting or any other
similar event.
- The
warranties in PART B are subject to regular or periodic maintenance being
carried out to achieve optimum performance of the PV Modules and parts.
The minimum recommended maintenance required is set out in the APS
Maintenance Schedule. Failure to conduct regular or periodic maintenance
may void the warranties in PART B. Notwithstanding, APS may at its
discretion apportion or allow all or part of any such warranty claim to
proceed subject to an inspection of the PV Modules or the parts.
- No warranty
claim shall be accepted for minor scratches or surface defects on any PV
Module or part unless such defect affects the performance of the PV
Modules warranted in PART B.
- The
warranties in PART A and PART B only apply to PV Modules and the parts
which can be identified by type, labeling or serial numbers as being
manufactured or distributed by APS or its authorized distributors.
- The
warranties provided exclude the transportation and handling costs or any
other costs for the return of the defective item(s) or the shipment of the
replacement item(s) to and from the ASP s stores to the Customer s or authorized
distributor site unless the consumer is taking advantage of their statutory
rights. All such costs including the cost of the removal and
re-installation of the replacement item(s) must be fully borne and paid
for by the authorized distributor or by the Customer before APS ships the
replacement item(s).
- No warranty
claim shall be accepted for the purchaser who has not cleared the due
payments as per their account. The warranty claims shall be accepted only
after the dues are cleared.
Warranty
Claims
- All warranty
claims must be lodged with APS within the applicable warranty period. APS
reserves the right to reject any warranty claim lodged outside the
relevant warranty period.
- Notifications
of any warranty claim must be addressed to APS at its address shown herein
or at http://www.australianpremiumsolar.co.in
To ensure a warranty claim is properly assessed without delay, the notification must contain the following details :
- The serial
number(s) of the PV Module(s);
- Proof of
Purchase or the original tax invoice; and a detailed description of the
claim.
- After a
warranty claim has been lodged, APS may request that the Customer provide
proof of all maintenance work done to the PV Modules as per the APS
Maintenance Schedule. Failure to provide proof of the scheduled
maintenance may void the warranties provided in PART B.
- Warranty
claims will not be processed if a PV Module or a part cannot be identified
by type, labeling or serial numbers as being manufactured or distributed
by APS or its authorized distributors.
- Before any
PV Module or parts are returned to APS, the return must be first authorized
by APS. Any such item returned and replaced under a warranty claim shall
become the property of APS.
- As some PV
Modules and parts are discontinued or superseded, APS reserves the right
to replace any PV Module or part with a newer model.
- The repair
or replacement of a PV Module or parts does not extend the terms of the
warranties in PART A or PART B for that PV Module or parts.